Labor Day weekend came early today on Storrow Drive
By adamg - 12/4/12 - 8:50 am
At 5:54 a.m., MassDOT tweeted:
Traffic Alert: Boston- Storrow Drive tunnel at Leverett Circle, overheight truck stopped @ tunnel entrance. Traffic back up both ramps.
At 6:12 a.m., the agency alerted those who were awake that the truck had been removed (but that traffic was still heavy as a result).
