MassDOT tweets [2] the tunnel will be closed from 9 p.m. Sunday through 5 a.m. Monday to allow inspectors to examine all the wall panels to make sure no more will simply fall off, like one did last night. The Globe reports [3] the inspection is pretty basic: Workers will yank on every single panel; any that are loose will be replaced.