Norm Vigeant posted a photo of three MBTA locomotives and a commuter-rail coach [2] crossing a causeway at the Wachusett Reservoir in West Boylston on Saturday.
Normally, the T would use the Grand Junction bridge (the train bridge under the BU Bridge) to move cars from its repair facility in Somerville to points south, but the bridge was shut last Wednesday for some emergency repairs, changing what used to be a 7-mile trip into a 108-mile loop by way of Ayer and Worcester [3].
Via A.P. Blake [4], who says the bridge could be shut for another couple of weeks.