The Somerville Transportation Equity Partnership has posted a photo of the temporary tracks [2] installed to let the Orange Line continue to run during the week as the Assembly Square station is built.
The Somerville Transportation Equity Partnership has posted a photo of the temporary tracks [2] installed to let the Orange Line continue to run during the week as the Assembly Square station is built.
Links:
[1] http://www.universalhub.com/users/adamg
[2] http://www.somervillestep.org/2013/02/assembly_square_9.html
[3] http://www.universalhub.com/somerville
[4] http://www.universalhub.com/mbta
[5] http://www.universalhub.com/taxonomy/term/3503
[6] http://www.universalhub.com/mbta/orange