Hey, there! Log in / Register

Orange Line had a fail due to a problem with the third rail

John Duffill reports the Orange Line was basically shut when the third rail short circuited at Haymarket before 10 p.m. The T was continuing to report "severe" delays as of 11:20 p.m.

Neighborhoods: 
Topics: 
Free tagging: 


Ad:


Like the job UHub is doing? Consider a contribution. Thanks!

Comments

Two fires in one day on the OL.

up
Voting closed 0